Installing a gravel driveway
Contents |
[edit] Introduction
If they are properly installed, gravel driveways can last for years and breathe new life into a property. With the right materials, it is possible to ensure the driveway doesn’t suffer from from common problems, such as; rutting, pot holes, puddles and weed growth.
[edit] Choosing the right materials
[edit] Geotextile membrane
A gravel driveway installation depends on surface preparation and undercoat. A good quality, permeable membrane will ensure that rain water or surface moisture has the ability to drain through into the earth. It also prevents the growth of even the most aggressive weeds. This is an essential part of the construction, and not a place to make savings.
[edit] Gravel grid
One of the main problems with gravel driveways is the potential for gravel to move. Though it is possible to simply lay gravel on any surface, this will lead to problems. The most obvious issue is what is described as ‘the ball bearing effect’ where loose gravel is moved easily across (and off) the surface as it’s travelled over.
For example, car tyres, feet, bicycle wheels – all have the potential to move and even ping gravel off the driveway. Keeping it in place is an important part of both installing and maintaining a driveway. Gravel driveway grids have a honeycomb structure and tough durable design built to hold the gravel within their core and prevent movement that can damage a driveway and can also be dangerous.
[edit] Gravel
Gravel is generally available from local home and garden supply stores at reasonable prices. Lower prices may be possible by buying direct from a local quarry.
[edit] Installing a gravel driveway
Gravel driveways are relatively straight forward to install with the right tools and preparation.
[edit] Clearing and preparation
It is possible to lay gravel onto an existing driveway surface without clearing or preparing the surface, but it is not recommended. This would lead to shifting, the formation of puddles and unnecessary wear and tear. It is important to clear the current surface and ensure there’s fresh soil underneath ready for the next step. Flattening the surface will also make the rest of the process easier.
[edit] Laying the membrane
It is essential to lay a good surface membrane to stop weed growth and allow for sufficient moisture drainage. It is possible to buy membranes in large sheets, which can be cut to size and laid to overlap for complete coverage.
[edit] Laying the grids
With the membrane properly installed, the next step is laying the grids that will keep the gravel in place. These durable tiles can be cut to shape and easily fitted by interlocking with one another to cover the entire driveway. Properly installed they will help ensure a flat surface and hold gravel firmly in place.
[edit] Spreading the gravel
The final step is unloading and spreading the gravel over the properly prepared surface. As the gravel is raked and brushed into place it will be absorbed into the honeycomb structure, meaning that there is less potential for the ball bearing effect and far less places for the gravel to go. As a result, less gravel will be needed to cover the same amount of space.
The result is a durable, long-lasting driveway that doesn’t suffer from the usual problems.
This article was created by --Gridforce.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February
Comments
Yes but what grade/density of membrane??